
Add to Cart
2P Type 2 Surge Protection Device 40kA SPD Low Voltage Lightning Arrester
In common situation, SPD is under high resistance. When the power network is under surge over voltage caused by lightning or other reasons, the SPD will be immediately powered; it will release the surge over voltage into the earth and protect the electrical equipment connected on the power network. When the surge voltage gets through the SPD and disappeared, the SPD will return to high resistance status. Then it will not affect the normal operation of the power network.
40kA SPD Technology characteristic:
Specification | BR-40 2P |
Item name | Surge Arrester |
SPD dassification according to EN61643-11 | Type 2 |
SPD dassification according to EN61643-11 | Class II |
Max continuous 0perating a.c. voltage Uc | 275V |
Max. discharge current (8/20µs) Imax | 40kA |
Norminal discharge current (8/20µs) In | 20kA |
Voltage protection level Up | ≤1.3kV |
Max. backup fuse | 125A gG |
Response time tA | ≤25ns |
For mounting on | 35mm Din rail |
Degree of protection | IP20 |
Operating temperature range Tu | -40℃—80℃ |
Operating state/fault indication | green/red |
Enclosure material | Thermal plastic |
Dimension:
40kA SPD Application:
Company profile:
Wenzhou Britec Electric Co., Ltd. was founded in the year 2003. We are instrumental in manufacturing, trading, exporting, and supplying SPD products to our client’s at most reasonable rates. Our range of products is highly demanded & appreciated in the market because of their sturdy construction premium quality, excellent performance, and long functional life. Before dispatch, our products are checked on varied quality factors to attain utmost client’s satisfaction and to assure the supreme quality.
Shipping:
Certificate:
FAQ:
Q. What is your MOQ?
A. Usually our MOQ is 200pcs each item, while we accept lower quantity for trail order.
Q. Can I get samples?
A. Sure.
Q. How long is the samples time?
A. Usually would be about 7days. For existing samples, it might be about 3days.
Q. How long is the production time?
A. It takes about 20 days, might be little changed accordign to factory production schedule.
Q. What kind of certificate do you have?
A. TUV, CE, CB etc.
Q. What is your payment term?
A. Usually would be 30% deposit, balanced before shipment.